Tuesday, 21 August 2018

The ACCmeets on the first Wednesday of each month.  Applications must be submitted by the Monday before the meetings.  Expedite fees of $100 will apply to ALL applications that owners want to have reviewed outside of the regular monthly meeting.

EFFECTIVE APRIL 13, 2018, ALL ACC APPLICATIONS MUST BE SUBMITTED TO COMMUNITY MANAGEMENT GROUP (CMG): 

MSR Architectural Control Committee
c/o Community Management Group
1777 NE Loop 410, Suite 600
San Antonio, TX 78217

PHONE:  210-774-4470
FAX:  210-774-4490
EMAIL:  msrpoa@cmg-hoa.com

Email: msracc@msrpoa.com


Click here to review the Architectural and Site Design Guidelines (rev. May 2016)


Before submitting any application, below are CHECKLISTS to be used to assure that your applications and plans are complete. Please review the checklists before submitting applications.  Incomplete applications will be delayed for review.

New Construction Applications certain Other Improvement Applications such as work shops require hard copies.  If the plans can fit into an 8x13 envelope or small box, they may be mailed to  MSR Architectural Control Committee, c/o Community Management Group, 1777 NE Loop 410 Suite 600, San Antonio, TX 78217

Fences, pools, decks, patios, children's play sets, landscape (fire pits) etc. may be submitted electronically with all the required site plans, material specifications per the checklists and pictures.  We prefer all documentation to be in .pdf format please.
 
New Construction Applications must be signed and accompanied by the appropriate review fee(s) and builder's deposit.  Applicants are reminded in order to be approved applications must be complete and have everything included as set out on the New Construction Design Review Checklist below.  Our most missed items are driveway finish, chimney material, location of buried propane tank, total height of the structure, location of concealed/screened trash bins and color samples.

 

REMINDER:  Construction Materials - Masonry Requirement

  • Masonry materials are natural quarried stone, quarried rock and stucco. Manufactured stone will be treated as non-masonry material. Hardi Plank or other cement board products are classified as non-masonry. Brick may be used only for accents (i.e., window trims, sills, columns, etc.).
  • Front and side exterior walls must be constructed ONLY with masonry materials.
  • In non-gated units only the REAR walls may have non-masonry not to exceed 25% of the non-windowed exterior surface of the rear walls.
  • Gated communities require 100% masonry.

 Applications and Request Forms:

Application Checklists:

Builder Signs:

 

 

 

 

 

 

 

 

Copyright © 2018 Mountain Springs Ranch Property Owners Association | Design & Hosting by: The Box